Saturday 22 May 2010

Station Work Completed (For Now)

Well, the surface on the platform for Stepney Down has been completely replaced.

The original card had sadly warped in the "damp" conditions of the shed where the layout is stored, so I decided to take the move of fully plastering the surface in stead, making it much more durable.
One thing I never counted was the trickiness of getting it all smooth etc, and ended up with a load of potholes on the first attempt.

This is now all sorted and the platform is painted back to black. While I was in the mood, I also "weathered" the station trackbed to the ash covered black as seen in the photos.

Next job, re-populate the station!